ClientSurat Municipal Corporation
Project LocationKaranj, Surat, Gujarat, India
Project Cost₹202.90 Crores (INR)

Consultancy Services for DPR, Design, Tendering, and Working Drawings – Karanj STP Augmentation (East Drainage Zone-A)

Appointed as the Consultant for preparing the Detailed Project Report (DPR), Design, Estimate, Tender Document, Tender Evaluation, and Working Drawings for the augmentation and rehabilitation of the existing 140 MLD Sewage Treatment Plant (STP) at Karanj, increasing its capacity to 211 MLD. The project is a key part of Surat’s infrastructure enhancement under its urban sanitation upgrade plan.

Scope of Work:

  • Preparation of DPR, Design, and Estimate for capacity expansion from 140 MLD to 211 MLD.
  • Tender Documentation & Evaluation, including 10 years of Operation & Maintenance planning.
  • Tertiary Treatment Design with integration of Biological Nutrient Removal (BNR), SBR, IFAS, and advanced filtration systems.
  • Rehabilitation of Existing Units and addition of new units, with structural and process optimization.
  • Design of Street Lighting, Instrumentation, Monitoring and Control Systems.
  • Automation via PLC–SCADA, including data integration with Surat Municipal Corporation’s central SCADA facility.

Key Project Metrics:

  • Capacity Enhancement: From 140 MLD to 211 MLD
  • Treatment Technologies: SBR, IFAS, Filtration
  • Automation: PLC–SCADA with central monitoring
  • DPR Status: Approved; Work Allotted

Impact:

The augmentation of the Karanj STP strengthens Surat’s wastewater treatment infrastructure by expanding capacity and integrating tertiary-level treatment, ensuring compliance with environmental discharge norms. The inclusion of automation, advanced nutrient removal, and central SCADA monitoring facilitates smarter and more efficient plant operations. The long-term O&M planning supports sustainability, while the project aligns with national and municipal sanitation improvement initiatives.